Decision Tracks

DT-series documents track specific policy decisions — or their absence — over time, anchored to ACI's structural analysis.

WP-series identifies structural risks · DA-series diagnoses system state · WEM monitors in real time · DT-series records what decision-makers do or fail to do. When someone asks "why didn't anyone warn us?" — the DT logs are the answer.

DT-001 · Capacity Mechanism · Finland
Active
Tracking window: 2023–present · Basis: WP-015 · WP-001 · Updated 16.4.2026
Finland is the only Nordic country without a capacity mechanism. This log tracks the decision timeline from the 2023 coalition agreement to the expected 2031 government proposal — and the winters that fall in between.
DT-002 · CHP Phase-out and Replacement Dispatchable Capacity · Finland
Active
Active · Apr 2026 · D-4 · Basis: WP-015 §3, §6 · WP-001
CHP capacity is exiting (Salmisaari 2025, Suomenoja 2024, coal ban 2029). Replacement investments add electricity demand, not dispatchable generation. The gap is widening.
DT-003 · Hydrological Monitoring and Nordic Coordination
Active
Active · Apr 2026 · D-4 · Basis: WP-015 §3 · WP-001 · Live: NVE proxy
Norway W15/2026: 32.9% filling (median 58%). Nordic surplus 53 TWh → 29 TWh by 2030. Drought synchronisation growing. No joint hydro stress protocol exists.
DT-004 · Data Centre Grid Connection Terms · Finland
Active
Active · Apr 2026 · D-4 · Basis: WP-015 §2, §4 · WP-001
Finland has no binding additionality requirement for data centre connections. 3.4 GW pipeline, near-zero elasticity confirmed. Priority Inversion Risk unaddressed. Trast: system hits wall in two years.
DT-005 · SE1 Industrialisation and Transmission Capacity · Sweden/Finland
Planned · WP-015 §3: SE1 transition from reserve to competitor. Tracking industrial investment decisions and cross-border capacity development.
DT-006 · HDCI Pilot · Pohjois-Savo
Preparatory
Preparatory · Apr 2026 · D-3 · D-4 · Basis: WP-016
Empirical validation of the Health Data Continuity Index. Findata licence pathway, cohort definition, calculation protocol. Pre-licensing phase. Pilot welfare area: Pohjois-Savo.