ACI — Publications
← Home

Publication Archive

Working Papers

SP-009 — Social Contract Recalibration: Policy Pathways
2026-06 · Domain D-3 · D-4 · Working Draft v0.1 · Companion to SM-013
Eight concrete pathways across four structural problem sets: tax base erosion, energy-welfare transmission, SurplusCitizen accumulation, sensor inadequacy. Four pathways require no legislation. Energy shock scenario illustrates cross-domain transmission.
SM-013 — Social Contract Calibration Failure
2026-06 · Domain D-3 · D-4 · Working Draft v0.1
The post-war social contract was calibrated to three assumptions that no longer hold. Seventeenth convergence instance. SurplusCitizen condition. Three architectural principles: value retention, sensor adequacy, surplus prevention.
SM-020 — 753 tuntia: Suomen tuontiriippuvuuden anatomia
2026-08-25 · Domain D-1 · Working Draft v0.1 · Empiirinen mittaus · 14 400 h aineisto
17.1.–17.2.2026 Suomi tuotti vähemmän kuin kulutti 753 tuntia yhtäjaksoisesti — 31 vuorokautta, keskituonti 2005 MW, keskihinta 159 €/MWh. Yhteyskohtainen purku Fingrid- ja ENTSO-E-aineistosta: rajoite Ruotsin suuntaan sitova noin 89 % ajasta hintaeron perusteella, SE1 kylläinen 66 % tunneista annettua kapasiteettia vasten (91,5 % keskikäyttöaste, ei 75,6 % kuten kiinteä NTC antaisi), ja Suomi vei Viroon 681 MW keskimäärin 94 % tunneista koko alijäämäjakson ajan. Kilpailuhypoteesi Ruotsin sisäisestä pullonkaulasta ei saa tukea. Johti WEM §12 -mittarin korvaamiseen.
SM-019 — Kaksi joustoa: hintaohjautuva ja siirtoehdollinen
2026-08-25 · Domain D-1 · D-2 · Working Draft v0.1 · Companion to SM-017, SM-018
Viiden lähteen ristiinluenta ilman omaa mallinnusta. AFRY, LUT ja VN 2025:94 mallintavat kaikki hintaohjautuvaa joustoa — kulutus vähenee kun sähkö on kallista. Fingridin kahdesta omasta asiakirjasta luettuna siirtohuiput osuvat halvan sähkön tunneille, joten hintaohjautuva jousto kasvattaa verkkoinvestointitarvetta, kun taas siirtoehdollinen jousto säästäisi noin 1000 johtokilometriä 400 kV verkkoa alle prosentissa vuoden tunneista. Kolme joustohyötylukua ovat kolmen eri toimijan taseissa eivätkä yhteenlaskettavia. Tarkentaa SM-018:n havaintoa 2 ja korjaa ACI:n aiempaa oletusta sijaintihinnoittelusta.
SM-018 — Selvityksestä instrumentiksi: mitä datakeskusten tiekartasta otettiin käyttöön
2026-08-24 · Domain D-2 · D-3 · Working Draft v0.1 · Companion to SM-017
SM-017:n empiirinen vastinpari: neljän maan poikkileikkauksen sijaan yksi prosessi ajassa. Kuusi päivättyä havaintoa siitä, miten VN 2025:94 (Mattila, 4.11.2025) on käytetty päätöksenteon perusteena — kärkisuositus kumottu ennen luovutusta, "korkean lisäarvon" nimike siirtyi instrumenttiin mutta yksi kolmesta määrittelevästä osasta ei, kompensoiva tukilaki ja sen kelpoisuusehto yhä säätämättä veronkorotuksen voimaantulon jälkeen. Yksi havainto osoittaa vastakkaiseen suuntaan (sijoituslupalaki) ja on mukana nimenomaan siksi. Elävä prosessi: kolme havaintoa muuttuu HE:n antamisen jälkeen.
SM-017 — Pohjoismainen lainsäädäntödelta: suurten sähkökuormien liittymisehdot
2026-08-24 · Domain D-2 · D-3 · Working Draft v0.6 · Companion to SM-018, SM-009, SM-011, SM-016, DT-001, WP-018
Suomi–Ruotsi–Norja–Tanska-matriisi, kahdeksan riviä. v0.2: Tanska täydennetty kohdennetulla haulla — hukkalämpövelvoite sitovampi kuin Suomessa, screening→modning→etablering-prosessi dokumentoitu. v0.4: ensimmäisyysväite poistettu, matriisi asemoitu olemassa olevaan kirjallisuuteen (VN 2025:94, Nordic Energy Research 2025:03, liittymisjonon allokaatiokirjallisuus). v0.5: "Operational" määritelty, F/I-luokittelu kriteereineen — viisi seitsemästä rivistä on institutionaalinen valinta, F-tapauksia täsmälleen kaksi. v0.6: luokittelu ankkuroitu päivättyyn tapaukseen, ja § 03:een lisätty sijoituslupalaki rinnakkaisena sääntelykanavana.
SM-016 — Kolme kattamatonta fiskaalista mekanismia
2026-08 · Domain D-1 · D-3 · Working Draft v0.1 · Companion to CN-013, SM-012
Kapea, sovellettu jatko kuuden olemassa olevan paperin päällekkäisyystarkistuksen jälkeen: Finnveran telakkatakauksen odotettu tappio (kaava annettu, PD/LGD ei julkinen), ALV-palautuksen ajoituksen korkokustannus ja T→∞-rajatapaus (SM-012:een kytketty; Fingridin ~5 GW putki ennustaa useampia Heikuran kokoluokan ALV-palautuksia), Fingridin liityntäriskin odotusarvo Fingridin omalla 10%:n realisoitumisarviolla (Jyrinsalo).
SM-012 — Energy Allocation and Fiscal Sustainability
2026 · Domain D-1 · D-3 · D-4 · Working Draft v0.1
Ten-year fiscal consequences of allocating 3 GW to SGFA vs foreign-owned data centres. Annual gap: 310 M€/year direct fiscal, 4.4 Mrd € total. Ten-year difference: ~44 Mrd €.
SM-011 — Industrial Grid Connection: Flexibility Quota and Auction for Inflexible Loads
2026-05-06 · D-2 · D-4 · Fingrid board decision · no new legislation required
SM-010 — Financing Instruments and Energy Clusters
2026-04-28 · D-2 · D-3 · D-4 · Continues WP-012 · WP-017 · WP-019
WP-019 — SGFA Retrofit Pathways and Regional Economic Multipliers
2026-04-28 · D-2 · D-3 · Working draft · Basis: SP-002 · SM-003 · TN-001
SM-009 — The ACI Diagnostic Paradigm
2026-08-20 · All domains · Version 1.1 · Synthesises WP-001 through WP-018
What cannot be measured cannot be governed. Measurement gap → sanction gap → correction gap. New §11: the disclosure-gap variant — EU-mandated data centre energy/water/waste-heat reporting (Reg. 2024/1364) exists but is sealed by national secrecy law (Sweden: OSL 30:23§), public only in aggregate. Tests the "data centres already flex" claim against Energiforsk 2025:1089 — not supported at scale.
WP-018 — Integration Quality Score (IQS)
2026-08-13 · Domain D-1 · D-2 · D-3 · Version 0.4 · Pre-print · Pilot
Measuring What Bond Spreads Cannot: pilot scores FI wind 4.1 · FI datacenter 4.7 · DK Ørsted 8.5. Corrected Aug 2026: D3 fiscal-capture confusion reverted; Ørsted/Bornholm scope separated (Bornholm is Energinet+50Hertz, not Ørsted's); Ørsted's own capital crisis (DKK 60bn rights issue, Hornsea 3 divestment, ~2000 job cuts) added — motivating evidence for pending FSC indicator.
WP-017 — Parliamentary Decision Latency and Market Signal Correlation
2026-04-26 · Domain D-2 · D-3 · Version 1.3 · Open Working Draft · 2 referee rounds
Bond Spreads as Necessary but Insufficient Indicators of State Sustainability. Asymmetric signal structure: sub-24h fiscal reaction vs. 76-month structural non-reaction. Three-country spread analysis. Investment pipeline typology.
WP-016 — Health Data Continuity Index (HDCI)
2026 · Domain D-3 · D-4 · Version 0.9 · Open Working Draft · 1 referee round
From Cost Accounting to Integration Accounting in the Finnish Welfare System. RKI_adjusted · IAI_conditioned · RVI_anchored. Incentive coupling mechanism §07.
WP-015 — Residual Market Failure and Elasticity Collapse in the Nordic Power System
2026 · Domain D-1 · D-4 · Version 1.0 · Open Working Draft
Three Simultaneous Structural Shifts and Their Interaction in the 2027–2030 Window
WP-015 — Residualisation of Spot Markets and the Elasticity Collapse
2026 · Domain D-4 · Version 1.0 · Open Working Draft
Shift I–III framework · Demand rigidification · Supply buffer erosion · Market residualisation · Phase transition to jump-regime
WP-014 — Dynamic Coupled Risk Model: OGAS2 and the System Health Index
2026 · Domain D-1 · D-4 · Version 1.0 · Open Working Draft
Four-layer stress model · SHI simulator · Monte Carlo backtest · 2026-Q1 structural SHI drop
WP-013 — Distributed Authorship and Structural Coherence in Human–LLM Research Systems
2026 · Domain D-6 · Version 1.0 · Open Working Draft
Three-level coherence hierarchy · Anchor-document model · FAI metric · DASC experiment
WP-012 — MESA Transition Pathway: From Structural Z3 to Operational Z1
2026 · Domain D-1 · D-4 · D-5 · Version 1.0 · Open Working Draft
Energy Sufficiency, Temporal Fragility, and the Architecture of Finnish Resilience 2026–2035
WP-011 — Institutional System-4 Architecture for Small-State Viability
2026 · Domain D-3 · D-4 · Version 0.2 · Open Working Draft
Pre-Crisis Learning, Credible Analogy Transmission, and the Cost Internalisation Mechanism
WP-010 — Why Energy-Bound Computation Inherits Grid Logic
2026 · Domain D-1 · D-4 · D-5 · Version 0.1 · Open Working Draft
Architectural pressure follows failure mode speed and visibility
WP-009 — Coupled Infrastructure: When Computation Becomes Energy-Bound
2026 · Domain D-1 · D-4 · D-5 · Version 0.2 · Open Working Draft
Capital structure shapes national digital infrastructure trajectory under energy–computation coupling
WP-008 — Institutional Allocation and System Continuity
2026 · Domain D-1 · D-3 · D-4 · Version 1.1 · Open Working Draft
A framework for analysing infrastructure capital allocation through the lens of system continuity
WP-007 — Situational Awareness Persistence Under Compound Stress
2026 · Domain D-6 · Version 1.0 · Working Draft
Structural properties of local intelligence platforms when energy, communications, and institutional decision support fail simultaneously
WP-006 — Continuity Computing: Decision Capacity as a System Invariant Under Compound Stress
2026 · Domain D-5 · Version 1.0 · Working Draft
Introduces Continuity Computing as a formal analytical category and formalises decision capacity dynamics through a control-theoretic model
WP-005 — Compound Stress and System Continuity: Finland 2025–2035
2026 · Compound Stress Diagnostics · Domain D-1 / D-4 · Working Draft
WP-004 — Recovery Capacity and System Vulnerability: Trajectory as a Diagnostic Indicator
2026 · Diagnostic Synthesis · Version 1.1 · Working Draft
WP-004 Calibration Series
WP-003 — Institutional Termination Time and Temporal Decision Capacity
2026 · Theory Note · Version 1.0 · Working Draft
WP-002 — Distributed Resilience Doctrine
2026 · Working Paper · Version 1.0 · DRD Series Paper I of VI
WP-001 — Duration Adequacy and Continuity Risk
2026 · Working Paper · Version 1.1

Diagnostic Assessments

DA-009 — Critical Resilience in Extended Human–LLM Systems
May 2026 · D-5 · v1.0 · Open
The erosion of error-detection under fluent authority — temporal arc
DA-008 — Cognitive Integration in Extended Human–LLM Systems
May 2026 · D-5 · Open
Shared mind without shared agency — epistemic identifiability constraint
DA-007 — DASC Baseline Coherence Assessment
2026 · Domain D-6 · Version 1.0 · Open Working Draft
Distributed Authorship Session Coherence — companion to WP-013
DA-006 — Labour Market Allocation Diagnostic
2026 · Domain D-3 · D-4 · Open Working Draft
Operationalises WP-008 indicators L–1 through L–5 for the Finnish labour market
DA-005 — Digital Infrastructure Allocation Diagnostic
2026 · Domain D-1 · D-4 · D-5 · D-6 · Version 0.4 · Open Working Draft
Six-country comparative analysis — France, Finland, United States, Germany, Estonia, Sweden
DA-004 — European Energy Investment: Category I / II Proxy Analysis
2026 · Domain D-1 · Version 1.0 · Open Working Draft
Tests WP-008 diagnostic partition against IEA aggregate European energy investment data
DA-003 — Infrastructure Allocation Diagnostic: Finland
2026 · Domain D-1 · D-4 · Version 6.0 · Open Working Draft
Operationalises WP-008 indicators I–1 through I–5 using structural Finnish energy system data
DA-003 Companion
DA-002 — Awareness Infrastructure Readiness
2026 · Open Working Draft
DA-001 — Finland Pre-Shortage Phase 2026–2032
2026 · Diagnostic Assessment · Version 1.1

Research Query Memos

RQM-001 — Correlated Continuity Blindspots in OECD Infrastructure Allocation
2026 · Domain D-1 · D-4 · Version 1.0 · Open Working Draft
Companion to WP-008 — specifies the E-1 empirical test

Technical Notes

TN-006 — Temporal Elasticity (εₜ): Measurement, Estimation, and System-Level Implications
2026 · Domain D-1 · D-4 · D-5 · Version 1.0 · Open Working Draft
Introduces εₜ as a diagnostic variable — companion to WP-012 and WP-001
TN-005 — Tier A System Audit Questionnaire
2026 · Domain D-3 · D-4 · Version 1.0 · Open Working Draft
Operative H-4b enforcement instrument for WP-011 framework
TN-004 — Decision-Critical System Scoping Tool
2026 · Open Working Draft
Defines the boundary between decision-critical and non-decision-critical in public sector digital architecture
TN-003 — D1–D4 Architectural Audit Metrics
2026 · Open Working Draft
Minimum audit criteria distinguishing nominal from operative H-4b — operationalises WP-011 §06
TN-002 — Duration-Capable Edge Intelligence Node
2026 · Open Working Draft
Architecture specification for WP-006 D1–D4 endurance requirements
TN-001 — Duration-Capable Local Energy Node
2025 · Technical Note · Version 1.0

Policy Reports

Suomen energiajärjestelmän rakenteellinen lukkiutuminen 2026–2032
2026 · Versio 4.1 · Avoin raportti · Suomi
Rakenteellinen analyysi kapasiteettivajeesta, CHP-alasajosta ja datakeskusten kuormasta. §2.5 skenaariot · §3.6 legitimiteettivaje · §6.0 vaihtoehtovertailu.
WP-020 — Perämeri Logistics-Energy Ecosystem
May 2026 · D-2 · D-3 · D-4 · Working Draft
Closed-loop model — Laanila SGFA + RoRo connectivity + domestic fuel supply · Coordination failure analysis
SM-008 — LDR-50 and MESA: The Right Answer at the Wrong Time
Apr 2026 · D-1 · D-4 · Heat-only reactor · Intervention window
SM-007 — The Convergence Finding
Apr 2026 · All domains · One structural condition across all domains
SM-006 — The 2028 Convergence Window
Apr 2026 · D-1 · D-4 · ENTSO-E empirical validation
WP-013 — Two Scenarios 2030: Institutional Delay as Structural Risk
Apr 2026 · D-1 · D-3 · D-4
Analyysi — TEM toivoo datakeskusten aktiivisuutta
May 2026 · FI · Energia · Digitaalinen suvereniteetti

Concept Notes

CN-009 — Finland and Denmark: Two Paths, One Structural Risk
May 2026 · EN · D-3 · D-4 · Institutional comparison
EDP · Flexicurity · Novo Nordisk concentration risk · Measurement gap in successful systems
CN-010 — The Missing Insurance Market: Grid Endurance Risk and the Price Signal That Doesn't Exist
May 2026 · EN · D-2 · D-4 · TN-009 · SM-011
Compound risk pricing · Tehoreservi calibration failure · Synthetic pricing hypothesis · CHP non-remuneration
CN-012 — The Water-Energy-Nutrient Coupling
2026 · Domain D-1 · D-3 · Working Draft v0.1
Eutrophication, biogas, carbon utilisation, and soil fertility as a single closed-loop architecture. Aquatic biomass → digestion → CCU → biochar fertiliser → nutrient return. The loop closes. Value stays domestic.
CN-016 — HEMS-kattavuuden erityisanalyysi: Itä- ja Pohjois-Suomi
May 2026 · D-2 · D-3 · Rovaniemi · NH90 · kaksoisrooli · Geneven sopimukset
CN-017 — RKOM Mechanism
2026 · Capacity mechanism design
CN-018 — Joensuu Pilot
2026 · SGFA pilot node
CN-019 — Realistic Governance
2026 · Institutional design
CN-020 — Transition Plan
2026 · MESA transition pathway
CN-021 — Pilot Metrics
2026 · Measurement framework
CN-022 — Legacy Ontology Recovery: AI as Institutional Memory Instrument
June 2026 · Domain D-1 · Ontological loss · Structure vs. intention · Wrong reconstruction risk
CN-023 — Intentional Irrecoverability: When Reconstruction Is Not Safe
June 2026 · Tacit knowledge severance · Domain opacity · Confidence stratification
CN-024 — PPA as Invisible Allocation Mechanism
June 2026 · Domain D-1 · D-3 · D-4 · Liquidity compression · Cannibalisation · BESS/FPA compensatory response
SM-015 — Political Feedback Loop
June 2026 · D-1 · D-3 · D-4 · Itseään vahvistava silmukka · 500 000 MW liittymäkyselyt · Kuntien kahden liikkeen strategia · CN-028 · SM-007
CN-028 — Infrastruktuurin omistussiirtymä
June 2026 · D-1 · D-2 · D-3 · 50+ kuntakauppaa 2018–2026 · Elenia/Macquarie · Thames Water -malli · Kahden liikkeen strategia
CN-027 — Kalibrointiasymmetria kolmella tasolla
June 2026 · D-1 · D-3 · D-5 · Teoria/mittari/instituutio · CA_N dynaaminen attraktori · HDCI · BRIDGE/MOSAIC · DASC-001
CN-026 — Muodon etiikka: Kalibrointiasymmetria
June 2026 · D-3 · D-5 · CA = Sf/Si · Campbell · Scott · Goodhart · EU AI Act · ARIA
CN-025 — The Unprotected Layer: Agricultural and Forestry Exposure
June 2026 · Domain D-1 · D-3 · Layer 3A/3B · SurplusCitizen condition · Spatial extraction loop
CN-015 — Helikopteriresilienssin toteutussuunnitelma 2026–2030
May 2026 · D-2 · D-3 · Aslak · NH90-kaksoisrooli · M-komponentti
CN-014 — Hajautettu helikopteriresilienssi
May 2026 · D-2 · D-3 · NH90 · HEMS · NAWSARH · M-komponentti · DRD-08
CN-013 — Spatial Value Capture: One Architecture, Three Systems
May 2026 · EN · D-1 · D-3 · D-5 · SM-001 · SM-011 · TN-014
Congestion rent, transfer pricing, unregulated lake systems — one architecture · timing of rule definition · Dp and the allocation race · EU as dragging anchor · HEM as signal constitution · SM-011 as ground tackle
CN-011 — Instruments Designed Within the Architecture They Compensate
May 2026 · EN · D-3 · D-5 · D-6 · SP-007
Reflexive limits of externalized situational awareness · instrument design under biological constraints · partial compensation structure
Analyysi — Tanska teki oikein, mutta Novo Nordisk varoittaa
May 2026 · FI · Kolumni · EDP · Institutionaalinen vertailu
CN-030 — Vaihtuva raideleveys ja huckepack-terminaalit
Elokuu 2026 · Suomi · Companion to WP-020
Luku 1 jaettu kahteen vaunutyyppiin (pussivaunu: rajoite korkeus, RATO 2; puutavara: rajoite paino). Uusi luku 3.4: puutavara häviää telinvaihdolle (kielteisesti testattu). Uusi luku 4.1–4.2: kotimainen ennakkotapaus (Oritkari 2004–2013, 30 000 ajon./v, päättyi) ja poolin institutionaalinen omistajuus.
CN-031 — Sulkeutumiskoko
2026-08-15 · Suomi · Companion to CN-025, CN-024
Maatilan energiaratkaisuilla on sulkeutumiskoko — pienin yksikkö jossa ne toimivat: tilan sisällä (aurinko, lämpö), naapureiden kesken (biokaasu, koneketju), teollisessa mittakaavassa (typpi). Mitattu kuormaprofiilin arvovaikutus: kerroin 4,19 — omakäyttöasteiden suhde, ei sisällä hintaoletuksia. Laskentaketju: TN-023.
TN-023 — Kuormaprofiilin arvovaikutus: laskentaketju
2026-08-15 · Domain D-1 · Version 1.1 · Emopaperi CN-031
CN-031:n kertoimen 4,19 täysi laskentaketju: 8 735 tuntia ENTSO-E-dataa, algebrallinen johto jossa hintatermi supistuu pois. Sisältää dokumentoidun itsekorjauksen (4,42 → 4,19, §07) ja täsmällisen revisioehdon (§10).
CN-008 — Perämeren logistiikka-energiaekosysteemi
May 2026 · Suomi · D-2 · D-3 · D-4 · Companion to WP-020
Suljettu kiertotalousmalli — koordinaatiovaje sitovana rajoitteena · Transfennica · RoRo · Laanila
CN-007 — Miksi järkevät asiat eivät etene
May 2026 · Suomi · Diagnostinen paradigma · Kolmen vajeen malli
Mittausvaje, sanktiovaje, korjausvaje — kapasiteettimekanismi empiirisenä esimerkkinä
CN-006 — Exit Topologies of High-D Systems
Apr 2026 · D-3 · D-4 · Four structural forms of resolution
External Reset · Internal Collapse · Distributed Resolution · Embedded Hybrid
CN-005 — High-D Stability Traps
Apr 2026 · D-3 · D-4 · Historical analogues
Portugal · Soviet Union · Japan · Finland — systems that failed without warning
CN-004 — Distributed Optimisation Without a Common Function
Apr 2026 · D-3 · D-4 · Structural property or correctable fault?
Companion to TN-007 · A/R/D monitor
CN-003 — Pool Method and Coordination Failure
2026 · Domain D-3 · Open Working Draft
Coordination failure mechanisms in collective decision-making
CN-002 — Human–LLM Cognitive Space
2026 · Domain D-6 · Open Working Draft
Cognitive architecture of distributed human–LLM research
CN-001 — Framing Capacity Uncertainty
2026 · Domain D-4 · Open Working Draft
Conceptual framing of capacity uncertainty in energy systems

Supporting Papers

SP-006 — Framing, Externalization and Cognitive Trajectories
2026 · Domain D-6 · Open Working Draft
Cognitive externalization in structured analytical frameworks
SP-008 — Narrative Capture and Signal Constitution
May 2026 · EN · D-3 · D-5 · D-6 · SP-007 · CN-013
Tarinankerronta vs. signaali instituutioissa · Dp-degradaatiomekanismi · retroaktiivinen faktakonstituutio · milloin instrumentti voittaa narratiivin · endurance-horisontti
SP-007 — Biological Constraints and Institutional Continuity
May 2026 · D-3 · D-5 · D-6 · Working Draft
Why decision window closure is neurocognitive before it is institutional · evolutionary mismatch · institutional failure modes reframed
SP-005 — Information Architecture and Deliberative Capacity
2026 · Domain D-3 · D-6 · Open Working Draft
Information architecture as a constraint on institutional deliberation
SP-004 — Cognitive Bandwidth and Decision Capacity
2026 · Domain D-3 · D-6 · Open Working Draft
Bandwidth constraints in distributed decision-making systems
SP-003 — The RAID-Battery: Segmented Energy Architecture, SEFI-R, and Fault-Tolerant Electrochemical Storage
2026 · Open Working Draft · CC BY 4.0
Architecture concept paper — SEFI-R testing methodology — economic analysis including appendices A, B, E, F, G
SP-007 — SGFA Institutional Blueprint: Making FAC an Enforced Property
2026 · Domain D-1 · D-2 · D-4 · v1.0 · Open Working Draft
Three binding constraints · HVK instruments · Fingrid reserve market · EU capacity mechanism · PPA cap · 2025–2029 pathway
SP-002 — SGFA 4.0: Kunnallisen energiavakauden toteutusohjelma
2026 · Executive Summary · Version 2.1 · Open Working Draft
Smart Grid Flexibility Alliance — MESA-arkkitehtuurin kunnallinen investointiohjelma
SP-001 — Power Adequacy Under Compound Stress: Reserve Duration and Tail-Risk Contraction in Wind-Dominant Systems
2026 · Domain D-1 · D-4 · Version 1.0 · Open Working Draft
Case Study: Finland 2026–2035 · Quantitative empirical foundation for WP-001 duration adequacy argument

Supplements

Ω-0 Reference Document — Recovery Capacity Diagnostic Instrument
2026 · Operational Reference · Open Use · No Attribution Required
MESA Architecture Framework
2025 · Architecture Reference

Synthesis Memos

SM-001 — Finland 2030: A Compound Risk Diagnosis
2026 · Domain D-1 · D-3 · D-4 · Version 1.0 · Open Working Draft
Five simultaneous structural pressures · Energy endurance gap · Household squeeze · Fiscal constraints · Institutional coordination deficit
SM-002 — DT-Series System Map: Elasticity Collapse as Compound Failure
2026 · Synthesis Memo · Version 1.4 · Open Working Draft
FAC (Freely Allocatable Capacity) · Es structural decline confirmed · SE1 regime switch · Nordic nuclear context · Basis: WP-015
SM-003 — Finland's Structural Advantage: Existing Biomass-CHP Infrastructure as SGFA Foundation
2026 · Domain D-1 · D-2 · D-4 · Version 1.2 · Open Working Draft
Bridges SM-002 FAC diagnosis to SGFA/MESA solution · 2027–2032 window · Sweden comparison · DRD L1/L2/L3 · ETS compatibility · Nuclear timescale analysis
SM-004 — Koordinoitu investointimalli ja ACI:n analyyttinen kehikko
2026 · Domain D-1 · D-3 · D-4 · Version 1.0 · Open Working Draft
Kaksi kieltä, yksi diagnoosi · DT-sarja vs. neljän lukon malli · Toimijasynergia · Koordinaatiovaje yhteisenä aukkona
SM-005 — SGFA for Practitioners: Business Case and Institutional Translation
2026 · Domain D-1 · D-3 · D-4 · Version 1.0 · Free use permitted
Municipal board annex · Fingrid strategic submission · EU funding annex · Financing structure (Vaihtoehto 3) · Investment prioritisation · No ACI terminology

Decision Tracks

DT-001 — Capacity Mechanism · Finland
2026 · Domain D-4 · Active Log · Basis: WP-015 · WP-001
Tracking the decision timeline for Finland's missing capacity mechanism · Tracking window: 2023–present
DT-002 — CHP Phase-out and Replacement Dispatchable Capacity · Finland
2026 · Domain D-4 · Active Log · Basis: WP-015 §3 · WP-001
CHP exits without replacement firm capacity · Coal ban 2029 · Gap widening · Tracking window: 2020–present
DT-003 — Hydrological Monitoring and Nordic Coordination
2026 · Domain D-4 · Active Log · Basis: WP-015 §3 · WP-001 · Live: NVE proxy
Norway W15/2026: 32.9% (median 58%) · Nordic surplus declining · No joint drought protocol · Tracking window: 2022–present
DT-004 — Data Centre Grid Connection Terms and Flexibility Obligations · Finland
2026 · Domain D-4 · Active Log · Basis: WP-015 §2, §4 · WP-001
No binding additionality requirement · 3.4 GW pipeline · Priority Inversion Risk unaddressed · Trast: "system hits wall in two years"

Fiction

The Broken Furnace — Pertti Vatanen and the Elasticity Collapse
2030 · Based on WP-015 · Winter Endurance Monitor v2.6